§ 50-86. Permit application. |
§ 50-87. Deviation from plans. |
§ 50-88. Issuing permits. |
§ 50-89. Refusal to issue permit. |
§ 50-90. Identification of minimum premium policy. |
§ 50-91. Asbestos removal. |
§ 50-92. Special foundation permit. |
§ 50-93. Public right-of-way. |
§ 50-94. Conditions of the permit, final inspection required. |
§ 50-95. Permit validation period. |
§ 50-96. Fees. |
§ 50-97. Expiration. |
§ 50-98. Permit issued on basis of an affidavit. |
§ 50-99. Plans. |
§ 50-100. Work starting before permit issuance. |
§ 50-101. Fees. |
§ 50-102. Fee schedule. |
§ 50-103. Types of fees enumerated. |
§ 50-104. Building permit valuations. |
§ 50-105. Method of valuation for determination of permit fees. |
§ 50-106. Site debris. |
§ 50-107. Written release. |
§ 50-108. Reinforcing steel and structural frames. |
§ 50-109. Plaster fire protection. |
§ 50-110. Fire resistant joints and penetrations. |
§ 50-111. Termites. |
§ 50-112. Shoring. |
§ 50-113. Threshold building. |
§§ 50-114—50-125. Reserved. |